Skip to Content
author's profile photo Former Member
Former Member

Batch master

hi experts

If i select the Tick mark in Purchasing view of my MM and the

system will through the batch number while creating GR.

then what is the purpose of creating Batch master using(MSC1N)

please explain the Batch master purpose and also the batch number

thanks

ganesh

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Oct 14, 2008 at 04:50 AM

    Hi,

    In case of batch managed goods, at the time of GR, you can either create a manual batch or allow the system to generate a internal batch No.

    Now using MSC1N, you can create an external batch No. and maintain the batch characteristics and later use this batch while you receive the material during a GR.

    Moreover, using MSC2N, you can change the batch characteristics and also batch related fields as per requirement

    Trust this clears your query

    Regards

    Merwyn

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 14, 2008 at 04:53 AM

    HI,

    If the materials come in Batches to the stock then the Batch management has to be active.

    For eg. if the stock of the material is 125K10234/125K10233 then here the frst 9 digits represent the material no and the next nine digits explain the Batch .

    If you display in MMBE then suppose the stock of this combination hsows the following then it means.

    125K10234/125K10233 1000 2000 6

    which means there is a stock of Qty 6 of material 125K10234 and its Batch as 125K0233 in storage location 1000 of theplant 2000. Here the Batch no represents the actual stock.

    So when the stocks are received in Batches the Batch management has to be active.

    Hope this helps,

    Regards,

    Prasanna

    Award pls if helpful

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Oct 14, 2008 at 04:57 AM

    MSC1N is to Create External Batch

    SAP menu-Logistics ® Central Functions ® Batch Management ® Batch ® Create

    On the Create Batch screen, make the following entries:

    Material B30120

    Batch Enter a name, such as DUMMYSODA

    Plant BP01

    Stor. location 0001

    Choose Enter.

    On the following screen that appears, enter a production date (such as todayu2019s date).

    Choose Enter.

    Choose Save.

    Go back.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.