Hi gurus, I want to create a process order without Production Version and include operations and materials manually.
For this reason I created a new order type in customizing with new dependement parameters.
Master Recipe Setection: 0 Does not use a master recipe.
But this is not enough to do it because when I create a process order by COR1 with this new order type the system ask me for a Production Version.
What is it wrong?
Thanks in advance!
Hi,
Your requirement was:
Want to select the operations adn Components manually.
You didnit want automatic selection.
In the entire thing which I have explained, I missed one point:
Define applications: OS30..
In this copy the Application of PP01 and create a new like: ZZ01
Assign the SelID 98 or 99 which you have created
SelID creation: Do not select 1, 2 or 3 etc.. bom Usage..
Select BOM Usage as 6 or 7 ..
Now it will be through..
Test this and revert..
Regards,
Siva
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks Siva, finally the problem was that I forget to change the selection of production version from 1: Manual Selection of production version to Automatic Selection of production version.
Thanks again
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks Siva, I did but I am still having the same problem, I think we are not taking into acount something
In OS30 I created a new aplication ZZ01 Assign the SelID 98 ( SelPri: 1, BOM usage: 6) but which indicator has to be fill in? AltSel? ProdVer? ExplMRP? etc..
One question What does it mean: S'elID creation: Do not select 1, 2 or 3 etc'?
Thanks!
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Remove the Tick for Alt.Det and Prod. versions from OS30.
The BOM Application is a Mandatory field in Dependent parameters, so we need to create an Application, for which you are not having a BOM at any point in time..
That was the reason, I was proposing BOM Usage 6.
In general we use BOM usage as 1 or 2 or 3.
I hope you got it.
Regards,
Siva
Hi Gurus thanks for the answers but for the moment it does not work properly
When I create the process order system still ask me for the production version, as Prassobh said the material has Explosion/Dependent Requirements define with 3 but I removed and still ask me for the production vesion
A Siva said I create a new application of BOM (OPJI,OPJM) with SELID: 98, SelPr : 1 BOM Uage: 6 and assign this to my Order Type
I Remove Selection ID, Task list type etc.. I Put the production Version to 0..
When system show me production version selection screen If I closed it no recipe is taken (That´s OK) but a BOM is taken, that is the main problem
Any idea
Thanks!!
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Javier,
I think you have a simple problem, In the material master MRP4 view under BOM Explosion/Dependent Requirements section define " "(Blank) for Selection Method field for the order material. I think currently for this material it is defined with "2" or "3".
Regards,
Prasobh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
In Dependent parameters you need to do the floowing settings..
Routing Selection 0
Remove Selection ID, Task list type etc..
Put the production Version to 0..
For operation:
Remove the Tick for Entry tool,
operation/act. increment.. blank
Now with these settings, System will not ask for Routing
But, if there is no selection for Routing, then system will give you error message and out from the transaction..
So, you need to Crete a dummy operation with the Transaction: OPJG
This should be reference to your new order type.
For BOM:
Create a new BOM Application with OPJI
You can put the settings like this:
SELID: 99, SelPr : 1 BOM Uage: 6
Assign this to your Order Type: Do the Assignment in OS35.
So, do this and revert for further discussion..
Regards,
Siva
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
While defining Dependent parameters for ur Order Type,
You might have opted selection through versions in Selection Id.
Please check that.
Kiran.
Edited by: S G Kiran on Oct 13, 2008 9:59 AM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
For Creating Process Order Production Version is mandatory.But if you don't want to use Master Recipe then no Problem, don't assign Routing no. in Production version.During Order creation system will not explode any routing or master recipe but generates one operation automatically.Then you can add or change new Operations and Phases as per your requirement.
Regards,
Dhaval
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
93 | |
11 | |
10 | |
6 | |
5 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.