Transfer cost planning to operative

hi

We r using CJ40 and unit costing where v r planning materials.

i want to transfer these planned material to be transferred to projects ( networks). How?

Regards

KP

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Oct 11, 2008 at 10:15 AM

    It is not possible to transfer material codes you have used for unit cost planning. Actual material will have to be attached to network activities manually. As of now i.e. in ECC 6.0 there is no facility to transfer the material codes used in unit cost planning to be used for procurement directly. However, there is a facility called easy cost planning. Material code used there can be converted as procurement item using easy execution services.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.