Skip to Content
avatar image
Former Member

SCRAP ORDER

HI

WE HAVE SEPEARATE MATERIAL CODE FOR SCRAP MATERIAL AND SEPARATE ORDER TYPE-PP

I CREATED PRODUCTION ORDER IN CO07 UNDER SCARP ORDER TYPE.

ORDER QTY - 5 KG

OPERATION OVER VIEW.

I MENTIONED OPERATION (PP03)WITHOUT WORK CENTER

IN COMPONENTS LIST

I MAINTAINED FERT MATERIAL = 2NOS FROM FG01 STORAGE LOCATION FOR OPERATION 0010

SCRAP MATERIAL= -5 KG TO SC01 STORAGE LOACTION FOR OPERATION 0010

I MAKE GI IN MB1A UNDER 261 MVT.

WHEN I DO CONFIRMATION AS YIELD = 5 KG

BUT THAT SCRAP MATERIAL NOT GET GR UNDER 531 MVT TO SC01 STORAGE LOCATION

HOW TO SOLVE THIS???

CORRECT ME...

THANKS IN ADVANCE.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • avatar image
    Former Member
    Oct 03, 2008 at 09:00 AM

    Hi,

    After confirmation do goods receipt also. Then only system post the material in str location.

    Regards,

    Dharma

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member R Brahmankar

      hi thx for reply

      i cant select the goods receipt indicator in production order header.

      note:

      i created production order without material..in co07

  • Oct 03, 2008 at 09:09 AM

    Dear,

    As you have mentioned the 531 movement type. This is posting a Goods Receipt for the material.

    Go for 531 M Type with GR

    In MB51 you can view what is the total qty of scrap

    Regards,

    R.Brahmankar

    Add comment
    10|10000 characters needed characters exceeded