Standard Cost estimate without BOM using only Routing.

Dear Friends,

I want to run Standard Cost estimate without BOM. I am having only activities. For example... I am manufacturing OXYGEN by taking the natural air. Natural air I am not maintainingin stock... it is not a material for me. But I am having different activities for manufacting OXYGEN.. I want to run standard cost with only routing... How can I do it? I tried.. but system is giving a error saying that "No BOM elements with relevancy to costing"

Thanks in Advance.

Regards.

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Oct 03, 2008 at 08:15 AM

    One option is to create the natural air as a pipeline material, with an extremely low price, so that it is effectively nil in your calculations.

    The other is to switch off the error message you are getting.