Folks, please consider below scenarios for CANCELLATION of inspection lot after 102 movement.
Scenario 1 Inspection plan is assigned to lot and status is REL. on posting 102 movement, lot gets cancelled and this is perfectly OKAY for us.
scenario 2 Inspection plan is not assigned and lot status is CRTD. now it does not get cancelled on posting 102 movement. This is REQUIREMENT.
I believe this is std behaviour but user does not want to assign IP manually everytime.
QUERY 2
Do we have a concept similar to production version in QM? if there are multiple plans available, system should choose a specific plan?