Rough Cut Capacity Planning

Hi,

SAP Gurus,

Can anybody give me the required configuration setting and step by step procedure for rough cut capacity planning.

Thanks and Regards,

Harriesh.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Sep 30, 2008 at 06:06 AM

    Dear,

    In OP45 , pls ensure that for the usage,task list type 3 (Rough cut planning profile) is included is only required confiuration setting.

    1- Create Rough cut planning profile - MC35. Enter material and plant nd execute. Enter status = 4, usage = 1.

    Enter a resource name and double clik on that line, choose Example work centre: Enter work center name, plant and unit = H.

    Enter the times required in Hours in the time buckets and save

    2-Create SOP plan - MC87. Enter material and plant. Execute. Enter sales and prod qty. Go to views>Capacity situation>Rough cut planning>show.

    3.In mc82, go to views->capacity situation->show

    You could display the capacity requirements at the bottom of the screen.

    Refer this link,

    http://help.sap.com/saphelp_46c/helpdata/en/8a/a5905c4adc11d189740000e8322d00/frameset.htm

    Regards,

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.