Hello,
The batch production date for some products is first entered at process order release. However, the GR is done using PI sheets. The GR entry via PI sheets takes the current date as the manufactured date and overwrites the old batch production date in the batch
Does anyone out there know if there is a way to control this so that old production date is not overwritten with the GR entry date?
many thanks.