Hi All,
An upgrade to a ECC 6.0 system form 4.6C or 4.7 system is fine. But however, in an integrated environment - the 4.6C system is usually integrated with other SAP Products as well.
The question I have is is a ECC 6.0 system compatible with BW 3.5 or lower versions of BW - i.e. when I upgrade my system to an ECC 6.0 system can these systems still talk in between themselves, or I have to plan a upgrade for this?
If the answer is yes - is it mentioned in any SAP Note/ Website or Document as because I also need an artifact to support the answer.
Thanks, Dibya