I have material A with component C1,C2,C3.
At the time of production order confirmation by using CO11N tcode, in 1st operation automatically consuming the C1 component by backflushing. After that save the confirmation.
Up to above cycle It is working fine.
As per above cycle in 1st operation at the time of confirmation it is picking the C1 some qty, But its now generate any document for Consuming of C1.
Kindly give me the soln for that