Skip to Content
0
Former Member
Sep 25, 2008 at 03:40 PM

ME59 with different PO Types

94 Views

Hello,

I would like to know if it is possible to use trx ME59 or the corresponding Job to create a PO automatically from a Pur.Req but with a different Document Type.

Doc.Type Pur.Req = "EC"

ME59 should be creating a PO de Doc.Type "PED"

In R/3 version 4.6C, standard , trx ME59 is creating POs of Type "EC" and not of type "PED".

How can I manipulate the doc.type created by the ME59 trx (or the corresponding Job)?

Is it Configuration or does there exist a User exit or Badi to manipulate this?

Thanks for any reply,

Aart