Hello,
I would like to know if it is possible to use trx ME59 or the corresponding Job to create a PO automatically from a Pur.Req but with a different Document Type.
Doc.Type Pur.Req = "EC"
ME59 should be creating a PO de Doc.Type "PED"
In R/3 version 4.6C, standard , trx ME59 is creating POs of Type "EC" and not of type "PED".
How can I manipulate the doc.type created by the ME59 trx (or the corresponding Job)?
Is it Configuration or does there exist a User exit or Badi to manipulate this?
Thanks for any reply,
Aart