I have a raw material of 100 tonns,with which i can make a finished goods of 54 tonnes,remaining amount would be scrap.
Finishes goods consists of two items Stator and a routor in the ratio of 2.4:1
that is 38.72 tonnes stator and 15.88 tonnes router.
Can this mapped in sap b1