Raw Material Inspection before Goods Receipt

Former Member
0 Kudos

Hi Gurus,

My Client wants to carry out Raw material Inspection before doing GRN.How it can be mapped in SAP.Please tell me the steps .

Thanks in advance,

Soumyendu

Accepted Solutions (0)

Answers (5)

Answers (5)

Former Member
0 Kudos

Hi!

If it is partaining to RM purchase then I think you should use insp type 89.

Regards,

Uday

Edited by: Uday Parchure on Sep 25, 2008 1:25 PM

former_member199502
Active Contributor
0 Kudos

Hi,

In SAP raw material inspection is carried out after doing GR for purchase order.It is not possible to have inspection before GR.if you want to just record the values which are inspected,you proceed with manual lot creation with inspection origin 89(miscellaneous)

with regards

Girish

rupesh_brahmankar3
Active Contributor
0 Kudos

Dear,

Kindly activate QM view in material master and activate inspection type 02( Goods issue inspection) for the materials you required

Go to tcode mm02 >selcet the purchasing view and mark the quality inspecton check box.

You can inspect & clear the stock before issuing to either costcenter or production etc.

Regards,

R.Brahmankar

Former Member
0 Kudos

HI

you need to create new inspection lot QA01 with inspection origin 89.

here you can do the inspection RR.

then after doing this you can go with MOGo for th PO 101.

-ashok

Former Member
0 Kudos

Hi

Activate quality view in material master, assign inspection type 01 and activate that. Create a quality plan for the material in QP01. As soon as migo-101 is done system will create an inspection lot. Clear the inspection lote in QA32

Edited by: BNR on Sep 25, 2008 9:53 AM