MRP Scheduling with a material with multiple production versions scrap rate

75 Views

Greetings all.

I have a problem with MRP scheduling. How do you account for different loss rates or scrap rates on a material because of multiple versions of a material that are in production. For example, we have an item. There are two differen ways to make that item and both have different loss rates or scrap rates. How do we account for this. And whatt happens when you have these with multiple routings. Thanks.