Hi u2013
I am trying to run Heuristics for the chain of 123456. It is obviously a Master Data issue, but I havenu2019t been able to figure it out.
123456 @ abcd
123456 @ wxyz --->PPM
-
D60188-001 @ wxyz and E18035-001 @ wxyz
E18035-001 @ wxyzlm01
However, for the level 123456 @ wxyz, I get the following error when I run Location Heuristic. I can manually create a Planned Order and it correctly explodes the PPM and creates the demand for components (D60188-001 and E18035-001).
In other words, for this level (123456 @ wxyz), I get the following error while running Location Heuristics even though I can create Planned Orders manually. I can run the location Heuristic for the level above this as well as below this.
Error : An error has occurred while planning product 123456 (location wxyz) in the SNP heuristic. Possible causes are inconsistencies in the master data or transaction data, or processing errors in the heuristic's flow logic.