Hi,
Is it possible to load the Planned Independent Requirements based on the production version. Example one FERT is having 2 Production versions like 0001, 0002. Is there any possibility to load the demand based on the Production version 0001 and 0002. If it is possible, please explain me with details.
regards,
V. Suresh