cancel
Showing results for 
Search instead for 
Did you mean: 

plan of delivery for number of vehicles

Former Member
0 Kudos

Hi Experts,

My outbound delivery is containing 20 MT of material to be despatched.

How to find or plan for 2 vehicle of 10MT capa each.

Or if i have availability of 4 vehicles of 5MT capa each, how to plan and execute?

warm regards

marias

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Dear marias,

Suppose 20 MT to be dispatched in two trucks with each 10 MT

You need to do two deliveries with 10 MT each , each delivery - header - Transport - MnsTrnspID , you can give the truck number and save .

In this way you can have referece for truck number .

saravanan

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

You may check the stock for the material in the required plant and storage location through transaction MMBE.

Hope it helps.

Regards,

Peeyoosh.