Hi Friends,
I am sending metal sheet in kgs to a vendor. He will cut into pieces and send back in number of pieces. I have to get back scrap sheets left with him and account it and will be scrapped later. I have BOM for Cut pieces with sheet as child item.
one piece = 0.25 kg in BOM and raise PO for cut pieces.
How to get back scrap and account it. Do we have to add scrap % in BOM ?
Please help
Regards
Hi,
Follow the steps,
1. Say i am providing three components A, B & C to get
ASSEMBLY from sub contractor vendor.
2. Create a Material master for Scrap material say D.
3. In BOM, maintain the Material D in negative quantity,
Say A - 1 off, B - 2 off , C - 2 off, D - 1 kg.
4. Now follow the regular process of subcontrating.
5. When you want to inward the scrap material from the
subcontractor end, first receive the material D with the
movement type 545 ( This will make the material available
in material provided to vendor stock ).
6. Then do a GR with 542 movement type to get the scrap
material in to plant stock ( ie reversal of 541- Goods
issue movement type)
BR,
Krishna
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
scrap should be entered in BOM as -ve qty...
While you recieve the end product(finished) scrap will be accumulated in vendor's place with the movement type 545 O-.
You have to reverse manually using 542 mvt type...
If its accumulation and over accumulation - 545
If cumulated qty is less you can do subsequwnt adjustment using 121 and indirectly 546 gets hit..
Reg,
Deepak.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
105 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.