Hello Everyone,

in SAP Business One 9.3 PL 03 I update production orders through the DI API.

I noticed, that the behaviour of the update method is different, when I add a production order Manually or by MRP.

Manually > the update method saves the start and end dates of the production order header and lines (for production orders with stages and without stages) to the database as I hand them over with the DI API.

MRP > the update method only changes the DueDate of the production order header to the date I hand over with the DI API and calculates all other start and end dates (header and lines for production orders with stages and without stages) with the route date calculation method and saves those dates to the database. The dates I hand over will be ignored totally except the DueDate of the production order header.

Is that behaviour correct?

If yes, how can I change that behaviour? I want the same behaviour of the update method for MRP created production orders as for Manually created production orders.

Thanks and Best Regards

Sylvia