Hi All!!
I have designed a BPM starting with two IDocs (MATMAS05 y CLFMAS02). Is designed with two start process in a switch. When one comes, wait a minute for the other. I'm not sure what IDoc comes first to the process, the I can lose data.
Somebody has any idea tto encapsulate the infornmation of the 2 IDocs without a ZIDoc?
Thanks and regards,
Manuel Míguez.