Skip to Content
0
Former Member
Sep 23, 2008 at 09:34 AM

calculation of sample size

76 Views

Hi,

The sample size is calculating as 0 even though the Inspection stage is 1 and inspection severity is 4.Please suggest me as to how this sample size gets calculated(formula or any method).The inspection plan is created in Jan and the materails were assigned to the plan in Sept.They all belong to a same group and for all the materails having this group ROHS and the group counter 11 the sample size calculates as 0.Looking for a reply