Hi ALl,
I am facing an issue.
I am doing an QM cycle in mm for raw material purchase.
Now at the Migo an ispection lot is created.Now I want to do some changes in the MIC of the inspection plan.
But am not able to do it. & to avoid this I created a inspection lot manually ,this time I dd the chages in the MIC & did the RR & UD, but there is no stock movement in this case.So I am stucked.
Please advice how can I avoid the Manaully created insp. Lot.
& how can I assign the new inspection plan to the inspection lot.
AFTER GOING THROUG HSOME POSTS I WAS ABLE TO ASSIGNE THE NEW/MODIFIED INSPECTION AS I HAD NOT DONE THE RR.
NOW MY ISSUE IS I HAVE CREATED AN INSPECTION LOT MANUALLY FOR WHICH RR & UD HAS BEEN DONE BUT THIS HAS NOT RESULTED IN ANY STOCK MOVEMENT.
PLEASE ADVICE WHAT SHOULD BE DONE FOR THIS ?
Regards