Hi SAP Gurus,
Sub contracting PO created on 2004 for Material 'x'. The component also same as the header material. ( Issuing component and recceiving component both are same ).
I have deleted the PO before issuing components to Vendor ( before 541 Mvt.)
But in MD04 the system driving sub contracting requirements against the deleted PO.
Is there any std correction program available to fix teh Issue.
Regards