Issue during Process Order creation: system cannot find valid routing

Hello All,

I am getting the below error(msg: CO 831) when I am trying to create a Process Order

"No default value maintained for op. generation for order type PI01"

Daignosis: You are creating an order for which the system can find no valid routing. When generating an operation the system cannot find any default value for the order type PI01 in plant XXXX

Sys Response: The system reacts with a termination since you cannot create an order without an operation and the data required to generate an operation has unfortunately not been maintained

I am not sure what (config) am I missing?

Please let me know if you can guide me to resolve it.

Thanks

SAP Fan...

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Sep 23, 2008 at 03:47 AM

    Hi

    i think you mihgt missed the OPJG settings pl check and

    give valuesagainst the plant and order type for the fields Control KeyPI01 ,Operation 0010 .

    Denominator 1

    Counter 1

    Base Quantity 1

    -ashok

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hello Ashok,

      Thanks for responding to my issue.

      Isnt the settings you have mentioned is valid only if you are creating the order without a routing.

      But we would need to create the order with the routing.

      Do you know what is the config part that will allow me to create the Process order with routing.(I am able to create a Process Order for another plant that already existed without the OPJG settings).

      Please let me know

      Thanks

      Amit

  • Posted on Sep 23, 2008 at 04:14 AM

    Dear,

    System is not able to get a valid Master Recipe for the Order qty/date or correct status and usage, so system should try to generate an operation for which we need to set default operation details for the plant/order type combination in Customization."OPJG" you need to maintain default values for creating operation

    Please check the valdity dates/qty and status of the recipe, if that was not created please maintain the default operation in customizing.

    This error is may be due to the order type was not changed is mainatain planned orders in the plant parameters OPPQ.

    Regards,

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hello R.Brahmankar,

      Thank you for your response.

      We do have created the master reciepe with valid status and dates. We do not have an issue for an exisiting plant but this issue is with the new plant that we configured.

      So we have not maintained anything in transaction OPJG (where you maintain default values for creating operation) for the other plant for which we can create Process Order. Basically we do need the routing so maintiaing a default value would not help I guess.

      I am not sure if this is an config issue or the master data issue. Do you think something might be missing in Resource or Recipe.

      Let me know

      Thanks

      SAP Fan..

  • Posted on Sep 23, 2008 at 04:16 AM

    Hi,

    First of all I guess you have created the Master Recipe (C201) and production version (C223).

    Now go to T.code COR4 - Order type dependent parameter for Process order.

    Select your order type (PI01) and plant and go to the details.

    - For Master Recipe selection - Master Recipe Mandatory (automatic Selction)

    - Production version - Automatic selection of production version.

    Do above setting and check.

    Regards,

    Dhaval

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Sep 23, 2008 at 07:17 PM

    First try maintaining the required master data in the new plant (BOM, master recipe and production version). Then try to create the process order for that material.

    In the material master (MRP view) maintain "Selection Method" as 2 (Selection by production version) so that when you create the process order, system will find the valid production version and based on that will fetch the correct recipe/routing in the process order.

    Hope this helps.

    Regards,

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.