Hi expert,
I did all required configuration:
- the batch level is Material (OMCT)
- internal Batch Number Assignment is activated (OMCZ)
- Define Batch Creation For Mvt is set to C for type 131
- Define Initial Creation of Data for Batch Master Transactions is set to C for my material type
- the indicator for BM is set in the view Plant Data/Storage Location for the material/SL
But still when I confirme my production with MF42N, the system is not getting the internal number range for the batch.
Any idea why?