hi EXPERTS,
i want to configure PI using ECC6.0.
my hard disk space is 250gb---233 net.
RAM -
2GB.
PROCESSOR -
2.8 DUAL CORE INTEL
OPERATING SYSTEM:-WINDOWS 2003 ENTERPRISE EDITION.
PARTITIONS:-
C:-5GB 2046-3950 VIRTUAL MEMORY
D:-228GB 5000-5500 VIRTUAL MEMORY
MY SYSTEM NAME IS -
SYSTEM.
I CONFIGURED MICROSOFT LOOPBACK ADAPTER.
THEN INSTALLED j2sdk-1_4_2_12-windows-i586-p AND PUT ENVIRONMENT VARIABLES.
AFTER I INSTALLED ORACLE 10G WITH DATABASE NAME "ORCL".
AFTER THAT SELECT InsMaster\IM_WINDOWS_I386->SAPINST.EXE
THEN SAPERP2005 SUPPORT RELEASE 1->SAP SYSTEM --> ORACLE
> CENTRAL SYSTEM
> CENTRAL INSTANCE INSTALLATION.
AFTER THAT IN STEP 2 , I SELECTED ECC , AS ABAP , AS JAVA , PI.
ASKED FOR JAVA COMPONENTS AND I GAVE THAT ONE.
THEN JCE POLICY AND I GAVE THAT ONE.
SAP SID-->ERP.
INSTALLATION DRIVE :-D:
MASTER PASSWORD.
DB ID :--AND I GAVE THIS AS ORC.
DB HOST:- IT TAKE AUTOMATICALLY(SYSTEM-NAME OF THE SYSTEM)
THEN I GAVE THE EXPORT1 PATH
THEN EXPORT6 PATH
THEN EXPORT 2,3,4&5.
THEN IT ASKED FOR ORACLE CLIENT,KERNAL AND BS2005 AND I GAVE ALL THE DETAILS.
IT ASKED FOR TO CONFIGURE SLD AND I SELECT RADIO BUTTON " REGISTER IN EXISTING CENTRAL SLD(DEFAULT)"
THEN IN SLD:-
SELF REGISTRATION OF JAVA ENGINE IN CENTRAL SLD
SLD HTTP HOST:- SYSTEM (I GAVE MY SYSTEM NAME)
SLD HTTP PORT:- 50100 (I GIVE THAT PORT AS 50000)
SLD DATA SUPPLIER USER :-SLDDSUSER(AUTOMATICALLY GENERATED).
PASSWORD:-GENERATED.
SELF REGISTRATION OF ABAP ENGINE IN CENTRAL SLD:-
SLD GATEWAY HOST:-SYSTEM (I GAVE MY SYSTEM NAME)
SLD GATEWAY INSTANCE NUMBER:-02
COMMUNICATION WITH CENTRAL SLD:-
SLD ABAPAPIUSER:-SLDAPIUSER(GENERATED)
PASSWORD:-(GENERATED)
AFTER THAT IT ASKED FOR SOLUTION MANAGER KEY AND I GIVE THAT ONE .
IN IMPORT ABAP PHASE I GOT AN ERROR. I HAVE DONE ALL THE PREVIOUS SUGGESTIONS WHICH WERE GIVEN BY EXPERTS AND I GOT THAT SAME ERROR ONCE AGAIN SO IAM POSTING THESE DETAILS TO GET THE CORRECT SOLUTION.
is there any mis configurations i done in these steps then tell me regarding those.