Skip to Content
0
Former Member
Sep 22, 2008 at 07:14 AM

Transports.-Configuration changes.

479 Views

Hi everyone,

Just a question about transports.

If i perform some configuration changes (say personnel actions

)in customizing client lets say client 20 in dev system and i want to test it.

Example: test client 30 in dev system, i can go to client 30 and use scc1, bring the transport, test it and if not satisfied, go back to client 20 and work on the same transport.

Assuming the following scenario: If i would like to test in a client 80 in different system say QA. I need to release the transport and basis would shift it. Now, my question is if i am not satisfied with the changes, as far as i know i cannot work on the same transport.

Kindly correct me if i am wrong.

1. Do i need to delete the previous transport and create a new transport for the same test scenario?

Generically speaking, if certain configuration changes or transports are present in dev client 20 and want to test in client 80 in diff system. What should be the procedure adopted for testing as well performing new configuration changes?

Thanks in advance.

M.Roza