Hi Experts,

This is in continuation with my previous thread, Inward Inspection involving Dynamic Modification. Just a brief abt my previous thread....

We do Skip first 9 lots against TC. Every 10th Lot is inspected including TC.After the Inspection, stock posting is taken place.

My doubt is,

during the production, Opertaors do find some mistakes in the INSPECTED material. They send the materials to Inward Inspection again. If this happens, then irrespective of the rule that I have mentioned in the top, they inspect 6 lots continuously. If some rejection takes place in between, next 6 continuous lots will be inspected.

How this can be mapped using Dynamic Modification.

Thnx in advance.

Sam

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Best Answer
    avatar image
    Former Member
    Sep 22, 2008 at 05:50 AM

    Hi Sam,

    As per your earlier thread req, your creating 2 stage in DMR (One is Skip stage with 10inspection lot and 2nd one is Inspection stage.)

    So now you can add one more skip stage in same DMR, skip with 6 inspection lot.

    When ever you phase the complaint from shop floor you have manually active the 2nd skip stage (6 inspection lot) with QDL2 tcode. Bcz automatic shifting with respect to shop floor not possible.

    Try and give the feed back.

    Regards,

    S.Babusingh

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Sep 22, 2008 at 05:42 AM

    Hi Sam,

    See the lots will be there always with skip stated according to the DMR. And UD for them can be planned or can be performed in mass. But one thing is for sure that the lot will be there. In your case for that sixth time where the discrepancy is found, the lot will be available and you can per form the quality result for the same and perform UD for it as per the regular lot. And then system set \ reset the Inspection stage and inspection severity, according to UD.

    For further inputs refer this link

    [Defining an Inspection Stage Change|http://help.sap.com/erp2005_ehp_03/helpdata/EN/3c/929d14db7d11d283cb0000e829fdb3/frameset.htm]

    [Deleting an Inspection Stage|http://help.sap.com/erp2005_ehp_03/helpdata/EN/3c/929d1ddb7d11d283cb0000e829fdb3/frameset.htm]

    Regards,

    Shyamal