Inward Inspection - With Skip

61 Views

Hi Experts,

This is in continuation with my previous thread, Inward Inspection involving Dynamic Modification. Just a brief abt my previous thread....

We do Skip first 9 lots against TC. Every 10th Lot is inspected including TC.After the Inspection, stock posting is taken place.

My doubt is,

during the production, Opertaors do find some mistakes in the INSPECTED material. They send the materials to Inward Inspection again. If this happens, then irrespective of the rule that I have mentioned in the top, they inspect 6 lots continuously. If some rejection takes place in between, next 6 continuous lots will be inspected.

How this can be mapped using Dynamic Modification.

Thnx in advance.

Sam