Skip to Content
avatar image
Former Member

SCM5.0 Upgrade error in PREPARE IMPORT / CNV_CHK_IMP Phase

Hi,

we are upgrading from APO 3.1 to SCM 5.0 upgrade.

we are running PREPARE and getting this error during the PREPARE / Import Phase.

PE0353ERROR: Outstanding DB conversions found.

All converter entries are listed in /usr/sap/put/log/TBATGCHK.LOG.

Proceed as described in the upgrade manual and repeat this phase

until all converter entries are removed.

This is the entry in TBATGCHK.LOG file

pg TBATGCHK.LOG

CONV ENTRY TBATG ENQU/SAPAPO/E_OMUPGR 0CNVI 20080920DDIC

CONV ENTRY TBATG ENQUESICNV 0CNVI 20080920DDIC

and the entry in TBATG table in sap is as below

Object type Object name Index ID Sequence Function Backg. or upgrade Date Req. by

ENQU /SAPAPO/E_OMUPGR 0 CNV I 09/20/2008 DDIC

ENQU ESICNV 0 CNV I 09/20/2008 DDIC

Could anyone suggest on this.. Any help is welcome.

Regards,

Sandeep.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • avatar image
    Former Member
    Sep 20, 2008 at 11:43 PM

    this issue is resolved with solution from other thread.

    The proble is not with table TBATG. The problem is with object ENQUESICNV. You can enter transaction code SE11 and activate the lock object "ESICNV" manually. After that you can repeat the Upgrade phase.

    prepare error

    Thanks,

    Sandeep.

    Edited by: Sandeep Soman on Sep 21, 2008 1:44 AM

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Thanks a lot! Even today with ERP 6.0 EHP7 systems it still helps during the SUM Update. 😊

      Only had to reactivate the lock object ESICNV and the update could be continued.

  • avatar image
    Former Member
    Aug 26, 2009 at 09:08 AM

    Thanks for this good blog. This has helped us during our upgrade to ECC6 where we were with the same issue.

    Add comment
    10|10000 characters needed characters exceeded