Skip to Content
0
Former Member
Sep 20, 2008 at 10:25 AM

Restrict the Issue qty against BOM.

37 Views

Hi Gurus,

I have a problem at the time of issue, which i explain as follows :

As per BOM to manufacture 100000 EA of A1 there was XYZ material required 100kg.

After all types of PP work (Productin Plan is for 100000EA) done.

So at the time of GI in MIGO If the stock of material XYZ is only 80Kg. I required a restiction to issue the material 80Kg (As the material short as per required qty i.e. 100Kg).

Please reply me i am waiting.