cancel
Showing results for 
Search instead for 
Did you mean: 

BOM Explosion Control in Variant Configuration

Former Member
0 Kudos

Hi Experts,

In Variant configuration environment.........Customer gives its requirement and user enters the sales order in SAP and configures the BOM out of the super BOM.

Now client wants that the bom should not be exploded till the time design department varifies and okays the BOM.

Once Design Dept okays, the Bom should be exploded and would be available for planning.

Could you please guide how to achieve this.

Thanks

Samar

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

This explosion of BOM in VC you can control by following setting in Configuration Profile:

Go to CU41/ CU 42-->Profile detail>Confign Initial Screen---> Confign Parameters -


.> Select Plnd/ Prod order under Process Tabv & in BOM Explosion Tan select NOne Radio buttons respectively and save the settings.

This will help you prevent BOM explosion while configuring variant in SO.

Hope this helps.

Revert if any doubt.

Regards,

Tejas

Former Member
0 Kudos

Hi,

Give ur authorization of MRP run to ur mrp controller only.

so when design department ensure that design and BOM is OK then only he will run MRP due to that u can control the explode of BOM

Nilesh