Skip to Content
avatar image
Former Member

Transportation

How to transport DEv system to Quality then production of SLD,IR & ID

regards,

kalpana

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

6 Answers

  • Best Answer
    avatar image
    Former Member
    Sep 18, 2008 at 05:14 AM

    You have to use Transport method

    Procedure:

    1) Call Integration Builder screen on DEV Server with http://hostname:J2ee Port/rep

    2) Call SLD (System Landscape Directory) Component from the Integration builder

    Save all the Following .zip files on the Local Desktop

    3) Select the Software Component & say Export that you want to Export from DEV

    Server to Production server and which is going to use in the IR of XI

    4) Also Select the Product of the above SWC and say Export

    5) Select the Technical Systems (TS of XI & TS of the SAP R/3) and say Export

    6) Select the Business System(s) & say Export; those are associated with above Exported

    Technical systems.

    In Production Server

    1) Logon to the SLD of the Production Server.

    2) Create a Technical System and Business system which points to the Production SAP R/3

    3) Go to Administration TAB in the main page of SLD

    4) Select the Import option to Import the SWC , PRD, TS,& BS which we Exported Earlier in DEV Server

    5) Click on Browse and select the .zip files that is to Import into Production Server,

    Which were stored on the local desktop at the time of DEV Server Export

    And say Import Selected File Option

    By this we exported and imported the SLD Objects

    Now we have to create transport groups and transport targets in the Production server of SLD

    Creation of? Transport Groups

    Edit Groups?Group?1) Select the Business systems

    2) Click on New Group and give the name of the group as DEV_group & select the

    Corresponding Development serveru2019s integration Server

    3) Similar way create another group for Production serveru2019s business system as

    PRD_group and select the Production serveru2019s integration Server

    Creation of? transport targets

    This is to Define which business systems in two different groups correspond to each other

    1) Select each Business system in the SLD and select transport TAB---click on

    Add/Change Target and select its corresponding target business system.

    For Example:

    If you select the business system of Production XI server means

    In the target you have to select group as DEVGROUP and the business system of Development XI server.

    Like this do the same for other business systems also

    Ex:

    BS_PRD_Integration Server----


    BS_DEV_Inetration Server

    How to create Transport Groups & transport Targets

    http://help.sap.com/saphelp_nw04/helpdata/en/ef/a21e3e0987760be10000000a114084/content.htm

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Jayasimha,

      Instead of Copy Paste the content from the Source, you can directly direct the Poster to this thread itself. So that he may get some more views w.r .t your reply

      transport-objects-in-same-group-in-sld

      Please try to avoid maximum copy paste things in this forum and instead please direct them to the direct thread from where we got the Info.

      Regards

      Seshagiri

  • avatar image
    Former Member
    Sep 18, 2008 at 03:33 AM

    1) File Transport

    2) Using CMS which needs configuration to be done

    Using the File Transport you can easily the Export the Objects and Import the Objects in the Target system.

    Select the Object in the Design or Configuration ->right Click you will find Export option.

    When you select the It creates the .tpz file which can be imported in the Target System

    Using file transfer or CMS we transport xi objects.

    Transporting XI from DEV to QA

    Look into this blog for how to export / improt IR and ID objects,

    XI Software Logistics II: Overview

    XI Software Logistics 1: SLD Preparation

    Transporting IR,ID Objects using File System

    http://help.sap.com/saphelp_nw2004s/helpdata/en/93/a3a74046033913e10000000a155106/frameset.htm

    http://help.sap.com/saphelp_nw2004s/helpdata/en/a8/5e56006c17e748a68bb3843ed5aab8/frameset.htm

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Sep 18, 2008 at 03:34 AM
    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Sep 18, 2008 at 03:37 AM

    hi,

    see this one also:

    Overview of Transition from Dev to QA in XI

    regards.

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Sep 18, 2008 at 04:00 AM

    hi kalpana,

    How will u transport xi scenario from development to testing?

    Ans) Using File System we can transfer to Development to QA(Testing) OR Using CMS.

    Using File System:

    1.Call the Context menu for a namespace or a software Component version in the Integration Builder navigation tree and choose Export------Or Choose Tools -- Export Design objects.

    2. Select the Transport using File System mode and follow wizards instructions

    3 The Integration Builder saves a binary export file with the suffix .TPZ in the export directory of the repoistery Server.

    4. Do not change the file name of the export file. If you do the Integration Builder will not accept it as the appropriate file when you import.

    5. To import the export files to anthor Integration Repoistery, first copy (or) move it to the Import directory of the target repoistery.

    6. call the design maintenance serene of the Intergration Builder for the target repoistery choose tools

    -


    > Import Design Objects.

    7. Select the export files saved in the import directory by using the dialogbox that apprears.

    8. If the import is successful , the export files are moved to the subdirectory<ServerDir>/XI/Repoistery-server/Imported Files.

    XI Software Logistics II: Overview

    XI Software Logistics 1: SLD Preparation

    Transporting IR,ID Objects using File System

    http://help.sap.com/saphelp_nw2004s/helpdata/en/93/a3a74046033913e10000000a155106/frameset.htm

    http://help.sap.com/saphelp_nw2004s/helpdata/en/a8/5e56006c17e748a68bb3843ed5aab8/frameset.htm

    regards

    srinivas

    Add comment
    10|10000 characters needed characters exceeded

  • Sep 18, 2008 at 05:32 AM

    Hii

    Transportation is of two types. a) File system Transport or b) CMS. If you want to use CMS then basis team should have install CMS.

    Check this document for transportations using CMS and File transport:

    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/f85ff411-0d01-0010-0096-ba14e5db6306

    Overview of Transition from Dev to QA in XI

    XI Software Logistics 1: SLD Preparation

    XI Software Logistics II: Overview

    https://www.sdn.sap.com/irj/sdn/weblogs?blog=/pub/

    you can use CMS or file system transport, depending on how your system is configured

    if your idoc scenario is from DEV1 to XID to DEV2 in the dev landscape

    and in the quas landscape is QAS1 XIQ to QAS2 then the transport target for DEV1 is QAS1 and the transport target for DEV2 is QAS2.

    that means the transport target is the corresponding business system under a different landscape, (dev or qas or prod)

    CMS is NW tool for transporting developments

    This will help you

    How to Use CMS in XI 3.0.pdf

    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/43f5d790-0201-0010-2984-ff72d822b109

    CMS based transport in XI

    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/b8d8f7b2-0701-0010-b09a-cda4cca2c98e

    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/9e76e511-0d01-0010-5c9d-9f768d644808

    With Regards,

    Add comment
    10|10000 characters needed characters exceeded