PP Order Split

hai pradeep,

It is possible to spilt the Order

Steps to split order :

1. In OPL8 Set the indicator cost collector

2. Default Rule -Periodic settlement(PP2)

3. CK11N do standard cost estimate

4. KKF6N Create cost collector

5. Create production order with op10,20,30,40

6. Go to op overview

7. Select the op from which you want to split (exop20)

8. Go to functions -


> Split order

9. Enter the qty ,if necessary a different order type for the child order

10.Execute

but i have the problem. when im trying to click SPLIT ORDER in function in production order . its in display mode.

what i have to do so??

note: i had done first two settings in opl8

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Sep 17, 2008 at 07:01 PM

    Hello Prakash

    Goto Operation overview ->Select the operation from which you want to split the order->Function-> Split Order.

    If not possible, Please check with order & operation status.

    Please try and combeck

    Regards

    Pradeep Kumar

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hello

      Certain prerequisites must be met before you can perform an order split.

      System Status

      An order split is allowed with the following system status:

      Header status: Partially released, released, partially confirmed

      Operation status of the split operation and all successors: Created, released, partially confirmed

      The order split is not allowed with the following status:

      Header status: Created, delivered, finally confirmed, locked, technically complete, closed, deletion indicator set

      Operation status of the split operation and all successors: Finally confirmed, dispatched, partially dispatched, capacity split, capacity requirement assigned, capacity requirement partially allocated

      Operation status of the split operation: Deleted

      Open Confirmations

      Release the operation or Order and do the order spilt

      Regards

      Pradeep Kuamr

  • Posted on Sep 18, 2008 at 09:22 PM

    Prakash,

    Please note that Order split is only allowed for Production orders(PP module). If you are using PRocess orders ( PP-PI) order split is not possible. In ECC 6.0 you can plug in High tech solution & only then

    Process orders can be split.

    So incase You refer to process orders you have to use High tech inductry solution to get this functionality.

    Hope this helps. If yes please award points. Else please come back.

    Thanks,

    Ram

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.