Suppose production order has 4 operations. Client says if drawings change they have to stop this production order and scrap the output.

How to do this ? Guys please help.

Regards,

Mohammad Arif.

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

closed

Former Member
0 Kudos

Hi mohammad,

Can u elaborate ur question?

Wat u exact want?

so we can help u.

Thanks & regards,

Nilesh

Former Member
0 Kudos

Hi Nilesh,

Let me explain the scenario.........

My client manufacturea based on drawings from customers. lets say drawing of a finishd product comes.Client analyses how many raw materials will be required, what will be the list of operations. consequently they start procurement and prepare operations list. Now they start production of diffrent semi finished.In the meantime their customers send revised drawings.These changes may be additon or deletion of one or more components in BOM of any semi finished.It may be change in dimension of some component.

In such cases suppose a production order ( 10 quantity) of one semifinished is running.It has 4 operations.2 quantity is confirmed.Rest 8 has to be manufactured and confirmed.First operation is confirmed for 8 quantities. second operation is going on and at this time drawing got changed. Now my client says they will scrap what all has been manufactured and stop the current production of that semi finished then and there.

In SAP how to address this? Because as I understand unless we confirm the last operation we cant do GR of the product( neither in storage location nor in scrap)

Regards,

Mohammad Arif.

Former Member
0 Kudos

Hi,

Q: As I understand unless we confirm the last operation we cant do GR of the product( neither in storage location nor in scrap)

A: Without confirming last opn, you can do GR (with completion of second or third opn.)

Move the material to rejection str location by MB1B 311 mvt. From there you can do scrap the material by 551 mvt.

Regards,

Dharma

Former Member
0 Kudos

Hi Dharma,

As you told without confirmation of final operation also we can do GR, please tell me what will be my finished product against which I will do GR?? will it be the same number i.e. my finished product number??

Regards,

Mohammad Arif.

dhaval_choksi3
Active Contributor
0 Kudos

Hi Arif,

- You can do GR With T.code MB31 without confirming the order.

- If you want to do it with Confirmation then first remove/Delete all the non confirmed operation from production order itself except last operation.Then confirm only last phase with auto goods receipt.After doing GR scrap that stock with movement type 551.

____________________________________________________

- Do Confirmation at order level with T.code CO15 / CORK and do the GR.Then Scrap the stock.

Regards,

Dhaval

Edited by: Dhaval Choksi on Sep 18, 2008 6:46 PM

Former Member
0 Kudos

Hello,

Do the partial confirmation & Partial GR for produced QTY and Issue the goods as Scrap with mvt type 551 from the production stroage location using MB1A.

Set the TECO status for production Order. Before doing that please check with CO cosultant for Costing aspect.