on 09-16-2008 2:00 PM
Hi,
Suppose production order has 4 operations. Client says if drawings change they have to stop this production order and scrap the output.
How to do this ? Guys please help.
Regards,
Mohammad Arif.
closed
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi mohammad,
Can u elaborate ur question?
Wat u exact want?
so we can help u.
Thanks & regards,
Nilesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Nilesh,
Let me explain the scenario.........
My client manufacturea based on drawings from customers. lets say drawing of a finishd product comes.Client analyses how many raw materials will be required, what will be the list of operations. consequently they start procurement and prepare operations list. Now they start production of diffrent semi finished.In the meantime their customers send revised drawings.These changes may be additon or deletion of one or more components in BOM of any semi finished.It may be change in dimension of some component.
In such cases suppose a production order ( 10 quantity) of one semifinished is running.It has 4 operations.2 quantity is confirmed.Rest 8 has to be manufactured and confirmed.First operation is confirmed for 8 quantities. second operation is going on and at this time drawing got changed. Now my client says they will scrap what all has been manufactured and stop the current production of that semi finished then and there.
In SAP how to address this? Because as I understand unless we confirm the last operation we cant do GR of the product( neither in storage location nor in scrap)
Regards,
Mohammad Arif.
Hi,
Q: As I understand unless we confirm the last operation we cant do GR of the product( neither in storage location nor in scrap)
A: Without confirming last opn, you can do GR (with completion of second or third opn.)
Move the material to rejection str location by MB1B 311 mvt. From there you can do scrap the material by 551 mvt.
Regards,
Dharma
Hi Arif,
- You can do GR With T.code MB31 without confirming the order.
- If you want to do it with Confirmation then first remove/Delete all the non confirmed operation from production order itself except last operation.Then confirm only last phase with auto goods receipt.After doing GR scrap that stock with movement type 551.
____________________________________________________
- Do Confirmation at order level with T.code CO15 / CORK and do the GR.Then Scrap the stock.
Regards,
Dhaval
Edited by: Dhaval Choksi on Sep 18, 2008 6:46 PM
Hello,
Do the partial confirmation & Partial GR for produced QTY and Issue the goods as Scrap with mvt type 551 from the production stroage location using MB1A.
Set the TECO status for production Order. Before doing that please check with CO cosultant for Costing aspect.
Regards
Pradeep Kumar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
86 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.