Skip to Content
avatar image
Former Member

ATP for sales orders

Hi,

Does anybody know how to switch off ATP ONLY for Sales Orders?

Customer would like to have ATP for deliveries, but not for sales orders. This means whatever delivery date will be entered during SO creation, system will accept it without ATP. On the other hand if there is nothing on stock system should create delivery with "delivered qty" = 0

The only transaction which connects ATP type (02 in this case) with checking rule (here: A- Sales order) is OVZ9. But I cannot switch off ATP there. I can only define different settings for sales order and delivery.

If I change settings in OVZ0, then it will switch off ATP for both: sales order and delivery

Customer has only one requirement class ZXX, so in OVZ) I can switch off ATP, but unfrotunatelly for both (sales order and delivery).

In standard I see requirement type 031 (Order requirements) and 011 (Delivery requirement), so I think this is the way I should go.

I've checked SPRO here:

Availability Check and Transfer of Requirement --> Transfer of Requirements --> Determination of Requiremenr Types Using Transaction.

The problem is that for one item category I can assign only one requirement type (ZXX in this case).

How do I switch off ATP only for sales orders?

Is it possible?

regards

Rafal

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Best Answer
    avatar image
    Former Member
    Sep 17, 2008 at 06:08 AM

    hi rafael

    I think the place where u went in spro..to assign requirement class to the "item category type and mrp type " is correct ....you have to consider the delivery requirement there..and you can switch off the ATP to be carried out at the schedule line level..then it should prevent ATP at order level..and ATP will be carried at delivery level..(since order has scheduled lines)

    correct me if iam wrong ..

    thankyou

    bj

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Sep 16, 2008 at 12:32 PM

    Dear Rafal,

    If your requirement is "whatever delivery date will be entered during SO creation, system will accept it"

    then try this,

    Go to IMG -SD -Basic Function -Delivery Scheduling & Transportation Scheduling -Define Scheduling by Sales Doc Type.

    Select the Sales Doc type & make the "Delivery Sch" field blank.

    By this the system will accept the date whatever you put. (for that sales Doc type only)

    Pls let me know, whether the problem is solved or not.

    Thanks

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi Rafal,

      I am using the same solution with scheduling agreement.

      Can u pls send me the screen shoot of the Field "Schedule line date for the delivery group" on the tab "Shipping" which is empty" on shailendra.panhale gmail.com.

      thanks