Purchase requisitions not transferred to R/3 from APO

Hi All

Purchase requisitions are created in APO and are not transferrred to R/3. Queue block in the outbound APO indicate the follwoing error:

Error during creation; GUID: ICSi}RNS0AlX08002We9FG ICSi}hNS0AlX08002We9FG ; Item 000010

Enter Order Type

Options tried: Cross checked with the material master,source list, integration models, publication type, distribution list in R/3 and APO but could not find any missing element.

Waiting for your inputs.

Thanks & Regards

Chakravarthy

Add a comment
10|10000 characters needed characters exceeded

Related questions

6 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Sep 12, 2008 at 12:37 PM

    can you please check application logs /SAPAPO/C3 in APO and let us know the detailed error message.Also run /SAPAPO/CCR report for the Pur.Reqs

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Sep 12, 2008 at 12:37 PM

    Hi Chakarvarthy,

    For PPDS

    Check parameter : In customisation ->Global Setting->Maintain Global Parameters and Defaults-->Transfer to R/3 Ext. Procurement

    Fo SNP :

    In customisation : SNP->Basic Settings->Configure Transfer to OLTP System ( Immediate /Periodic/No Transfer )

    For CTM :

    CTM profile : Setting - >Basic Setting-->R/3 Integration -> Transfer Mode

    Thukral

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Sep 12, 2008 at 12:40 PM

    Hi Chakravarty,

    Would like to know:

    1) Is Contract Included in Source List?

    2) Is contract valid - I mean If PR has generated with 15/09/08 as del. date but Contract is valid till 10/09/08 only. It happened in my project so sugget you to have a look at it.

    Morover, system should show you some sort of reason in /SAPAPO/CCR Report also.

    Hope it Helps

    Regards,

    Hardik.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Sep 12, 2008 at 12:43 PM

    Please run the consistency check :

    /SAPAPO/TSCONS - Consistency Check for Time Series Network `

    /SAPAPO/CONSCHK - Model Consistency Check

    /SAPAPO/OM17.

    Also check SLG1 log or /SAPAPO/CQ will give your more details.

    Manish

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 16, 2009 at 02:10 AM

    Hello,

    I have a similar issue. Did you get to the root cause?

    Thanks,

    Chak

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 16, 2009 at 05:43 AM

    Hi Chakravarthy,

    In Customisation IMG settings,

    1) SAP SCM > APO > Supply chain planning > SNP > Basic settings > Configure Transfer to OLTP systems > Check whether the radio button is on "Immediate transfer".

    2) Also please ensure your change pointers for purchase requisitions from APO to R/3 should not get deleted via any background job using transaction /n/sapapo/c5.

    I hope this will solve your issue.

    Please confirm

    Regards

    R. Senthil Mareeswaran.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.