hi all
i am using kso2 for extending cost center period
like from kso2
constere number 500012
from menu button i have selected edit--> analysis period
slected another analysis period.
while changing the period i got the following error
New analysis period must not exceed maximum period limit
Message no. KS023
Diagnosis
You selected an analysis period extending beyond the period for which
the object was defined. This is not allowed in the change or display
functions.
Procedure
Use an analysis period within the period for which the object has been
defined.
You can derive this period from the suggested "From/To" values in this
screen.