cancel
Showing results for 
Search instead for 
Did you mean: 

copying plant

Former Member
0 Kudos

Hello Guru's, i'm trying to copying the plant to create a new one ..but some of the movement types never got copied same with the SLoc's and Warehouse's .....what and how should i do it and if i'm missing some of the movements types whats the best way to make the movement types work for the newly created plant, Sloc's or Warehouses ....and also ....when i get some kinda error say ...enter " ***" doesnt not exists in the table " **** " ...what should i do to see the entry in the table ..and coming to the acct assignment ...for NB type PO ....i should be able to make the PO without acct assignment ....Plzz help

Thanks all

Accepted Solutions (1)

Accepted Solutions (1)

former_member335885
Active Contributor
0 Kudos

HI,

It depends on which plant and what movement types it as before copying from the this plant to create a new plant.

Some time in the standard system you often get this error of please check the table for missing entries.

for this you have to go to SE11 / SM30 and give the table name and press enter and you can go and maintain the relevent entries which are missing.

IN the standard system, the system will allow you to make the PO without account assignment. Check ur personal settings if you have defaulted any account assignment while you are going to create a PO. Check the Configurations in the SPRO - MM - purchasing - Account assignment.

Thanks & Regards,

Kiran

Former Member
0 Kudos

i want the plant to be as a existing plant...so i would like to copy all movement types associated with the exisiting plant to the new plant .........oh well i would like set AS IS for the new plant

Former Member
0 Kudos

someone plzz respond to this post.

Thank you

Former Member

Dear,

Have a look the below: may be you get some missing info.

Step by step process of creating another plant or storage location by copying from an existing one

Plants Definition :

/NSPRO-IMG-Enterprise Structure-Definition-Logistic General-Define,copy,delete,check plant---Define Plant (In this, we are defining plants(s) under company which is defined earlier)

/NSPRO-IMG-Enterprise Structure-Definition-Logistic General-Define,copy,delete,check plant- copy,delete,check plant-F6 to copy org. object from plant 0001 to defined plant(s).

Storage Location :

/NSPRO-IMG-Enterprise Structure-Definition-Materials Management-Maintain Storage Location-New Entries (Define required storage location(s) under different plant(s) )

/NSPRO-IMG-Enterprise Structure-Definition-Materials Management-Maintain Storage Location-Storage Location Description-- New Entries ( enter here addresses of each plants)

Copy Organizational object Plant using Transaction: EC02. (recommended to Copy from a standard sap plant)

Create or copy storage location using :OX09

1. Copy existing plant A to new plant B. All of plant Au2019s data in throughout the IMG will be created/copied for plant B. In some cases with plant A data that is not desired. In step 3 you must go through and correct invalid entries

2. Correct address information

3. Correct data copied to plant B as plant A

(a) In Sales and Distribution -> Shipping -> Picking -> Determine Picking Location -> Assign Picking Locations (OVL3), delete entry where Shipping Point = plant A and Plant = plant B and press save.

(b) In Sales and Distribution -> Shipping -> Basic Shipping Functions -> Shipping Point Determination -> Assign shipping points u2013 wherever plant B is found the shipping point is plant A. This must be changed to plant B.

(c) In Enterprise Structure -> Maintain Structure -> Assignment -> Sales and Distribution -> Assign shipping point to plant u2013 delete plant B shipping point from the plant A assignement.

(d) In Enterprise Structure -> Maintain Structure -> Definition -> Sales and Distribution -> Define, copy, delete, check shipping point u2013 copy shipping point plant A to shipping point plant B. Correct the description in the define section of this node.

(e) In Sales and Distribution -> Shipping -> Picking -> Determine Picking Location -> Assign Picking Locations (OVL3), copy plant A entry to plant B entry, changing all data to plant B.

(f) Check with Reorder buying group to determine MRP controllers for new plant. Remove plant A MRP controllers from plant B, and add controllers received from reorder buying group. IMG is Materials Management -> Consumption Based Planning -> Master Data -> Define MRP controllers

(g) Define special procurement. IMG is Materials Management -> Consumption Based Planning -> Master Data -> Define special procurement type.

(h) OMGN u2013 Assign customer in u201CSet up stock transport order u2013 [Plant]u201D.

OMGN u2013 in u201CSet up stock transport order u2013 [Purchasing Document type]u201D; an entry was created for source plant B and plant A, this entry should have a UB order type and the check box should be off. Each plant needs a plant B UB entry created.

(j) OMJ3 u2013 Delete incorrect entry in print parameters. Remove entry where plant = plant B & storage location = plant A. Create entry for plant B storage location B

(k) Verify entry for new plant exists in OVLT picking output

(l) Verify entry for new plant is correct in VP01

4. Manual configuration

(a) Create plant customer number and assign to plant in OMGN.

(b) OMJ3 u2013 set correct printer for plant B

(c) OPK8 u2013 Set printer for plant for list LG01. This is for production orders.

(d) Output determination OVLT (set printer),

In addition to above, other changes based on customization in your installation needs to be done as well.

Regards,

Syed Hussain.

Answers (0)