Hello friends,
I have selected the MRP Type V1 (Manual Reorder Point with external reqmt).As per the SAP F1 help it considers the Reservation and sales order.
I have kept Reorder point for this material as 100 and maximum stock level as 300 and have kept lot size as HB (Replenishment upto maximum stock level) and my stock of this material is 95.Now i have created manual reservation of this material of 5 qty against the cost center.After running the mrp (single item single level), system is creating procurement proposal of qty 205.
But my question is since it considers the reservation,sales order, so system should create procurement proposal of qty 210 instead of qty 205.
Plz let me know where i have misunderstood.