Skip to Content
author's profile photo Former Member
Former Member

CS Credit Limit Check

Hi,

Can someone please assist me with Credit Limit checks in CS Orders. CS uses Credit Limit Groups from SD Credit Management/Risk Category. Credit limit checks for order types in Credit Management includes Sales Document types and does not include Service Order Types

When Credit Limit Checks are performed in Service Orders, the planned costs in Open Service Orders are not included in the Check.

How do I include the Planned costs from Open service order in the Credit Limit Checks?

Thank you.

Regards

Vogie Perumal

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Posted on Sep 11, 2008 at 03:09 PM

    Hello,

    Information in note 555925 may be helpful.

    -Paul

    Please use Enterprise Asset Management (EAM) forum for PM/CS specific topics

    Enterprise Asset Management (SAP EAM)

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Sep 23, 2008 at 10:30 AM

    Hi Paul,

    Thank you for your response. CS is configured correctly but unfortunately, Credit Limit Checks are not performed on Open Works Orders, which is a problem.

    Kind Regards

    Vogie

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.