Hi PP Gurus,

We are having one SFG say 'X' containing three production version say 001,002, and 003 for production line PL-1000, PL-2000, and PL3000 with same Receiving storage location. We are usingh standard REM profile 0002-Final backflush w. activities with all other PP master data correctly.

While doing backflush for production version 001 system is giving right Production line i.e. PL-1000 for posting activities. But we are trying for the same for Production version 002 or 003 system is though populating/exploding proper/right BOm as per production version but it is giving production line 'PL-1000' for these versi

Accepted Solutions (1)

Accepted Solutions (1)

former_member184655
Active Contributor
0 Kudos

Dear Abu,

If the Cost of production is different for different production versions means,then try out this .

For Eg:

1.REM Profile 1 - 0001 - GI backflush at GR Posting & for cost Accounting the radio button for Backflush

using standard cost estimate for the material.Now let's assume initially this REM profile is assigned in the

material master.

2.Once if the same material is going to have 1 more production version,and if you want to select any one

production version for backflushing then after creating production version,Product Cost Collector------>

Pre.Cost Estimate--Save,now create a new REM profile say 0003 - with

GI backflush at GR Posting & for cost accounting select the radio button Using Data from Preliminary

Costing for Product Cost Collector.

Now assign this new REM profile in the material Master say 0003 and after that check in MFBF,select the

respective production version and check whether you are getting the proper result.

Check & revert back.

Regards

Mangalraj.S

Former Member
0 Kudos

Hi R. Brahmankar/ S. Mangalraj,

Thanks for your prompt replies.

See what we did. Initially at the tiemopf Production version creation we didn't assign Production line in Production line column for each production version and Product cost collector are created with standard cost estimate. Latter while doing backflush we realize for 002 and 003 production version system is not popolating right productio line i.e. PL-2000 and PL-3000 respectively.

Still we are getting the same error though we assign proper production line before each production version.

Please revert with solution.

Thanks & Regards,

Abu Arbab

former_member184655
Active Contributor
0 Kudos

Dear Arbaba,

Check with this & let me know where you are struck up.

1.Material X(FERT) initially with BOM Alt1 & Rate routing 1 or say (prod.Line 1) I create a Production

version >product Cost Collector>Pre.Cost Estimate-->Data saved.

Now say in REM profile 0001---> 0001 - GI backflush at GR Posting & for cost Accounting the radio button

for Backflush using standard cost estimate for the material.Now let's assume initially this REM profile is

assigned in the material master.

2.I'm creating a different Rate routing and assigning Prod.Line2 for this.--->second production version --->

product Cost Collector>pre.Cost Estimate->Data Saved.

3.Now create a new REM profile say 0004 - with GI backflush at GR Posting & for cost accounting select

the radio button Using Data from Preliminary Costing for Product Cost Collector.

4.Now assign this new REM profile in the material Master say 0004 and after that check in MFBF,select

the respective production version and check whether you are getting the proper result.

5.A material can have only one standard cost estimate made out of a BOM & routing combination.So it

has happened through your production version 1(where prod.Line1 is assigned).Now suppose if you want to

doa production booking using prod.version2 whose manufacturing cost will differ from prod version1,so

that's the reason I'm asking you to change the REM profile which will to take the cost from Pre.Costing

from the Product Cost collector.(As per the new REM profile will to do the production confirmation manually

selecting the prod.version).

Check & revert back.

Regards

Mangalraj.S

Former Member
0 Kudos

Hi R. Brahmankar, Mangalraj,

Thanks for immediate reply.

Input from R. Brahmankar was more realistic, the reply from Mangalraj is so useful but slightly confusing too.

Anyways thanks for timely help.

Thanks & Regards,

Abu Arbab

Answers (1)

Answers (1)

rupesh_brahmankar3
Active Contributor
0 Kudos

Hi,

Have you define the production line in the production version correctly?

If you have created a work center instead of a production line, enter the number of of the work center.

The production line you enter in the production version must also be used in the routing also.

Please do consistancy check of production version and come back.

Regards,

R.Brahmankar

Edited by: R Brahmankar on Sep 10, 2008 12:40 PM