PP: Rework Order with ref to Trigger Point

Hi,

I have some problem in managing rework.

I have 3 operation in production order; order quantity is 10 units.

After conf. of operation 10, I find yeild is 4 units, rework is 6 units. Through trigger point I create a rework order of 6 unit. (I have used a control hey which support rework).

I execute the rework order and then want to procees the original order. System does not allow me to confirm more than 4 units in operation 20. I want to confirm 10 units in operation 20.

In confirmation parameter my setting is "Error when operation sequence is not adhered", "Error for over delivery tolerance" - these settings can't be changes.

Regards,

Abir.

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Sep 09, 2008 at 12:27 PM

    Hi,

    If you create the trigger point as to be triggered at the partial confirmation of the order, then at the confirmation of the order, enter the rework quantity in that field with partial confirmation selected and save the confirmation.Please try by removing Error for over delivery tolerance.

    Regards,

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi,

      Are doing confirmation of rework order or original order. Please check.Inis standard SAP procedure, do the confirmations for rework order & rework material will be issued from stock to order.

      And GR will not be done for rework order. To get stock for reworked material do the GR for original order.

      Hope clear to you.

      Regards,

      R.Brahmankar

  • author's profile photo Former Member
    Former Member
    Posted on Sep 16, 2008 at 10:23 AM

    ok.

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Abir,

      How did you solve your problem?

      I have a similar scenario.In this I am using trigger point in opertaion 10 to generate a new operation lets say 0012(rework operation).

      Now in opaertaion 10 ,I have confirmed 6 out of 10 quantities and sent 4 for rework.In operation 0012,which is rework operation,I confirm 4 quantities (rework quantity).

      Now i want to confirm total 10 quantities in operation 0020 but I am not able to do it.

      Can u pls guide.

      Settings are - Warning when over delivery tolerance exceeded , Warning for under delivery.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.