Variant Configuration with Projects

Hello All,

I am looking into the functionality of Variant configuration in PS. I am aware of the steps required such as defining chracteristic, assigning them to class, setting object dependency etc. However I am not able to produce the same in system. It will be great if I could get detail step by step guide on configuring the above.

Thanks in advance.

Thanks

Sarang

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

2 Answers

  • Best Answer
    avatar image
    Former Member
    Sep 09, 2008 at 01:20 PM

    Hi,

    I think whenever you create variant configurator.....default class would automatically assigned to it.

    But if you want to see the manually....check tcodes CU41/42/43 and CN08 where these materials are assigned to standard network and activities.

    Regards

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi,

      There is lot of difference in assigning material in CN01 and CN08. In CN01, you cant assign material directly, have to do it using BOM. This is for template purpose ie standard network. The CN08 assignment is for assembly processing. In assembly processing, when you create Sales order for a material, project gets created automatically. So CN01 is of ur interest.

      Regards

  • avatar image
    Former Member
    Sep 09, 2008 at 11:55 AM