cancel
Showing results for 
Search instead for 
Did you mean: 

material extention from plant to plant

Former Member
0 Kudos

How the material is extending from plant to plant with the same number. what is the process running inside, when we do this.

Accepted Solutions (0)

Answers (4)

Answers (4)

former_member192897
Active Contributor
0 Kudos

Go to MM01 and give Material Number in Copy From Field and click on Orgn Levels and Input New Plant & tor Locn and in Copy From Tab Input Old Plant & Storn Locn and Enter and Save.

You can Use MM50 also For Extending Material Views.

Regards,

Ashok

kunal_ingale
Active Contributor
0 Kudos

hi

got o mm01

here give the material no (already exist) in copy from field then same no give in the material code field

now eneter and proceed

regards

kunal

award if helpful

Former Member
0 Kudos

do with MM01 and copy from old plant.

pankaj_singh9
Active Contributor
0 Kudos

Hi,

Go to MM01 and here enter material and copy from material as same material code and select the views and organizational elements and extend the views.

Else you can use MM50 also.