Skip to Content
0
Apr 01, 2018 at 03:26 AM

SAP EPC Integration with Oracle Primavera

1297 Views Last edit May 31, 2018 at 04:36 AM 3 rev

HI There,

SAP EPC is already installed and upgraded the patch to SAP EPC 2.0 SP3 by SAP Basis Consultant.

May I know what all tasks to be done by SAP EPC Consultant and what are Mappings/Configurations required and where to do this integration in SAP ABAP and Oracle Primavera ?

Kindly Help !!!