raw material stock to be consider against sales order in md50(i.e mrp run)

when i run MD50 against particular sales order, it is not considering stock of raw material. it is creating planned order for raw material which is already in stock. my problem is that when i run mrp it should consider my raw material stock.

manish.

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • Best Answer
    Posted on Sep 05, 2008 at 09:33 AM

    i am not assigning any strategy to my finished product, its totally depends on market condintion(mto & mts).

    manish

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi,

      For all the BOM components (up to last level) check in MRP 4 view of Material master

      Individual / Collective - It should be Individual or Individual/Collective.

      If is maintain as Collective then you will not get planing Proposals though MD50.

      For all BOM headers Materials (FERT , HALB ) check in MRP 4 view for MRP for Dependent requirement should be maintain as Dependent requirement are Planned

      Check the "Selection method" field in MRP4 view for the FG.

      It should have values "Nil" or "1"

      Regards,

      R.Brahmankar

  • Posted on Sep 05, 2008 at 08:54 AM

    Hy Manish,

    Just check whether Individual / Collective requirement is set as Individual (Option 1) in MRP 4 View of that Material.

    Regards,

    Dhaval

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi Manish,

      Correctly said by all our Experts (Mr.Brahmankar , Mr.Dharma)

      Now all you have to decide whether you want to go for this individual or Collective requirment type.Because on one hand

      - If you select individual requirement then system will not consider available stock and generate Proposals for every single requirments.

      Also you will find PR and Plan order with account assignment of Sales order (in case of MD50)

      - If you select collective requirement then system will not generate planing proposals through MD50.In that case you have to go for individual MRP (MD02 / MD03 / MD41 / MD42).

      Regards,

      Dhaval

  • Posted on Sep 05, 2008 at 09:13 AM

    Hi,

    Are you using Planning strategy 20??

    Procurement Before Sales

    This stage does not apply to this strategy because there is no production without a sales order. If sales orders exist in the system in advance, production is performed before the required delivery date.

    Refer this link,

    http://help.sap.com/saphelp_45b/helpdata/en/cb/7f9b7043b711d189410000e829fbbd/frameset.htm

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Sep 05, 2008 at 09:16 AM

    Hi,

    For raw material above one level in MRP4 view Individual/ Collective req, it should be 2- Collective.

    Now run MRp and check the result. System will consider raw material stock.

    Regards,

    Dharma

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 20, 2008 at 04:35 AM

    .

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.