Mass change in IW38/28 grey out

Former Member
0 Kudos

Hi Experts,

In our system, the 'Carry out mass change' in IW38 is grey out. Is it controlled by configuration?

Thanks,

Accepted Solutions (1)

Accepted Solutions (1)

paul_meehan
Advisor
Advisor
0 Kudos

Hi,

The EA-PLM extension switch must be activated and the user must have authorization for I_MASS object.

Mass change options should then be available.

-Paul

Former Member
0 Kudos

Thanks, Paul. Is EA-PLM a configuration item or basis stuff?

Charlie

paul_meehan
Advisor
Advisor
0 Kudos

Hello Charlie,

EA-PLM can be activated in customizing as follows:

IMG:

- Activate SAP ECC Extensions

Then select 'Enterprise AddOns' tab.

You can check the current status to see if it is off or on.

If off then check with your Basis people about activating it. Note 855959 and additional notes listed in note 877008 provide some more information on these switches.

-Paul

Answers (0)