09-04-2008 11:26 AM
Hi gurus,
I need to add 4 fields in costing view of material master. I have followed the steps in SPRO, for configuring customized screen in material master.
1) Created a function group YMMCO and copied the screen 2904 from program SAPLMGD1.
2) Added 4 fields in my customized screen.
3) Created copy of 01 ( Screen reference ) to z1 in OMT3B.
Since 2904 is not there in the sequence . I changed one 0001 sequence at the end to 2904 . I also assigned my program
SAPLYMMCO to it. I can see the changed fields in data screen and subscreen.
4) Then I assigned the SSq to z1 in transaction OMT3E.
But unfortunately, when I go to MM01 to create a material , I am not able to view the fields I added in costing view.
I have checked the screen for the previous field, it shows 2904 only.
Two days back, I did the same thing in basic data view 1 , it was working properly. As per client's suggestion I put it in
costing view, it is not working . Please give me suitable suggestions.
Thanks in advance.
D. Mallick
10-24-2008 5:16 PM
Hi,
I also need to add custom fields to Basic data view. After copying & changing the screen sequence in Config, I could able to see the custom fields in Basic Data view.
I have appended structure with custom fields to MARA table.
But the values I enter in the screen is not getting updated to the table MARA.
Can you please let me know the code, I should have have in PAI (Process After Input) module in the Sub Screen to update the values?
Thanks,
Dasa
10-24-2008 8:56 PM
Please review OSS note 44410 for instructions on how to add custom fields to the material master.
10-15-2010 6:44 AM