on 09-04-2008 11:12 AM
Hi all,
This is regarding the overhead costs split to different Production orders.
The scenario is for e.g There are 3 production orders
P-1
P-2
P-3
and the first 2 production orders(P-1 and P-2 ) are assigned profit center 1
and the last production order (P-3 )is assigned a profit center 2.
In the costing sheet configuration the profit centers are defined and profit center 1 is assigned 10% and the profit center 2 is assigned 20%
The overheads/ other direct costs should be split into 3 pdn orders in the % assigned to the profit centers.
Is this possible? if so, let me know the methodology.
Thanks and Regards
Karpagam
absolutelly possible
if you have defined the % per PC in KZS2 and there are costs on the orders (as the basis for %)
than you have to run KGI2 or CO43 (mass)
cheers
matej
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.